| SL. No |
Name of the work |
Progress details |
| 01 |
Foundation work |
100% Completed. |
| 02 |
Super Structure work |
Ground floor to 4th Floor Roof Slab 100% completed. 5th floor roof slab 50% completed. |
| 03 |
Block Work |
|
| 04 |
Electrical conduiting work |
|
| 05 |
Door frame fitting work |
|
| 06 |
Sanitary & plumbing line work (AC drain water line, verandah- vertical line) |
|
| 07 |
In side Plastering work |
|
| 08 |
Electrical cable wiring work |
|
| 09 |
Wall tiles work |
|
| 10 |
Common sanitary & Plumbing line work |
|
| 11 |
Outside plastering work |
|
| 12 |
Floor tiles/Marble work |
|
| 13 |
L.C.C work |
|
| 14 |
Grill & Railing work |
|
| 15 |
Inside paint & Polishing work |
|
| 16 |
Switch -Socket fitting work |
|
| 17 |
Outside paint work |
|
| 18 |
Door shutter work |
|
| 19 |
Aluminum/Glazing work |
|
| 20 |
Tiles Pointing work & Marble finishing work |
|
| 21 |
Commode – Basin fitting work and C.P fittings work |
|
| 22 |
Lift/Generator /Substation /Solar work |
|
| 23 |
Boundary wall /Ground floor development work |
|
| 24 |
Roof top finishing work |
|
| 25 |
Roof top Gardening work |
|